On the Critical Path

On the Critical Path

On the Critical Path


(7 desde 1 usuarios)

0h 22m 1971 HD

Ver on the critical path Cuevana 3. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path (1971)
ver now
Tags:   #On the Critical Path 1971   #On the Critical Path peliculas completa   #Ver   #On the Critical Path online   #On the Critical Path online Cuevana 3   #On the Critical Path Peliculas completa online   #On the Critical Path peliculas gratis   #On the Critical Path Cuevana   #ONF | NFB   #nuclear power   #candu

Comentario

User

Relacionados